It has become clear in recent months that the drainage system under the 4th fairway was failing to do its job properly. There has been some debate amongst the course team as to the exact configuration of the drainage system and the reasons why it was failing. To address the problem the team set out to properly identify the location of the pipes, examine their condition and repair any damaged sections. Although old plans existed of the drain pipework it had been felt they were incomplete and did not tell the full story. Since accurate mapping was carried out on the golf course prior to the irrigation system being installed it is now possible for us to complete a more detailed plan of the drainage system.
Tuesday, 10 February 2009
4th Hole Drainage
It has become clear in recent months that the drainage system under the 4th fairway was failing to do its job properly. There has been some debate amongst the course team as to the exact configuration of the drainage system and the reasons why it was failing. To address the problem the team set out to properly identify the location of the pipes, examine their condition and repair any damaged sections. Although old plans existed of the drain pipework it had been felt they were incomplete and did not tell the full story. Since accurate mapping was carried out on the golf course prior to the irrigation system being installed it is now possible for us to complete a more detailed plan of the drainage system.
More Tree Work
Some trees have been removed from the bank that separates the 9th and 10th holes and more trees have been removed from the right hand side of the 18th hole. Due to the steep bank on the 18th a large excavator was used to move the felled trees into an area suitable for chipping to take place. Inevitably a certain amount of damage to the turf has occurred around the area where the excavator was working but this will be reinstated by course staff in the next few days.
Tuesday, 13 January 2009
Winter Course Closures
The unusually cold weather recently has meant the golf course has had to remain closed for most of the past three weeks. Whilst this is obviously frustrating for the members who wish to play, it is worth reminding ourselves why play is restricted when frost arrives.
Surface frost is basically frozen dew that has crystallised on the grass, making it hard and brittle. A grass blade is actually 90 percent water, therefore it also freezes. Because of the short mowing height (6.5mm at this time of year) and fragile nature of the turf, putting greens are most affected by frost. Walking on frost-covered greens causes the plant to break and cell walls to rupture, thereby losing its ability to function normally. When the membrane is broken, much like an egg, it cannot be put back together.
Wednesday, 10 December 2008
Bunker Renovation
When planning bunker renovations there are a number of factors we take into consideration. Firstly the existing style of course bunkering is examined. We currently have a mix of "rolled in" turf bunkers and also sod stacked/revetted bunkers. We aim to develop a consistant style throughout the course and have decided to use the revetted style in all future bunker refurbishments.
Next we look at the position of the bunkers. With the advances in golf ball and club technology bunkers can become obselete. Before rebuilding any bunker we must decide whether the bunker is still best placed from a strategic perspective. Is the bunker still doing the job it was originally designed to do?
Finally we look at the bunker from an architectual perspective. Is it in keeping with the surrounding ground and the hole in general?, Does the bunker contribute positively to the aesthetic appeal of the hole?
If we are satisfied the bunker is in the correct location then we proceed with the work. If we decide that significant alterations are required, we will engage our golf course architect to carry out a detailed assessment before we proceed.
Tuesday, 18 November 2008
Holm Oak Clearance
Holes 15-18 at La Moye are blessed with some of the best views to be found anywhere in Jersey. Unfortunately, over the years the unchecked spread of the holm oak has all but eliminated these views in some areas. In conjunction with our Ecological Management Plan we have embarked on a phased programme of holm oak clearance to open up the beautiful vistas we are blessed with. Some of the results are quite startling.
There will be a large amount of clearing up to do once the contractors have left the site. We will reinstate the ground by scraping back to bare earth then seeding lightly with appropriate grasses. Holm Oak saplings will be removed as they emerge to ensure the area does not succumb to infestation in the future.
Wednesday, 5 November 2008
Temporary Closure Of Holes 17 and 18
Holes 17 and 18 will be closed for 5 days to allow an intensive bunker refurbishment programme to be undertaken. Whilst the bunker work is being carried out J le Maistre Tree Surgery Ltd. will be clearing Holm Oaks on the same holes. This measure has been taken to protect course staff while working in greenside bunkers and to allow the free movement of machinery without disruption to members. In the event of the work being completed early then the holes will reopen earlier than planned.
The course staff would like to apologise for any inconvenience caused but trust members will understand the importance of this work taking place in a safe and timely manner.
Tuesday, 4 November 2008
Robin Dagger
In an attempt to penetrate the layer of silt/clay material found under some of our greens we have been using a machine called a Robin Dagger. As can be seen in the video below, a single metal probe is driven into the soil profile to a depth of 50cm. Once fully inserted a burst of high pressure air is fired horizontally in two directions at the base of the hole. The air pressure used is around 135psi. This helps open the compacted silt/clay layer creating channels for water to drain into the sandy sub layer. We then fill the holes with sand to keep the channels open for as long as possible.
Monday, 27 October 2008
Tee Scarification
Thursday, 23 October 2008
Winter Work On The Courses
Course staff here this comment from well intentioned players regularly but in fact nothing could be further from the truth. If anything, we are even busier in the winter than we are in the summer. As a young apprentice greenkeeper I recall my boss telling me "when the grass stops growing the real work can start" This seemed a strange comment to make, after all ,what could there be to do on a golf course in the winter? I was soon to learn that there are a number of vital tasks carried out every winter that go unnoticed by most people but are crucial for the long term health of the golf course.
Sub-Surface Aeration
This winter we will use a range of equipment designed to aerate the soil to varying depths. A slit tining machine will be used on greens, surrounds and approaches to make knife like cuts in the turf to a depth of around six inches. This task will be carried out around three times each month with the primary aim being to allow air and water penetrate into the soil profile helping keep the surface as dry as possible.
A slit tine machine
A verti-drain machine will be used on greens, tees, fairways and approaches. This machine punches holes in the turf to a depth of up to twelve inches. The main aim with this machine is to relieve compaction and improve the movement of water through the soil profile. Surfaces that are kept drier are much less prone to disease, compaction and general sward deterioration. In the longer term the holes made with the verti-drain will provide the perfect space for the grass roots to grow into. Long grass roots are needed to help the plants withstand periods of drought in summer.
The Verti-drain machine in action
Thursday, 28 August 2008
Maintenance Week 2008
Hollow coring has been carried for two main reasons -
1) To remove thatch from the greens, which in turn helps water and air move more freely into and through the soil. This helps keep the surface of the greens dry and promotes general turf health and vigour.
2) To provide an effective seedbed. The holes made on the green are ideal for sowing seed into and provide the perfect haven for new young grass plants to grow.
Hollow coring on the putting green
Overseeding is carried out to improve the overall grass species composition in the sward. Three varieties of Fescue grass were used. These particular plants have the ideal characteristics for golf green purposes and increased numbers of fescue grasses will dramatically improve the year round conditions on the greens. You may have noticed the yellow patches on some of the greens recently, this is a turf disease called anthracnose and certain grass species are particularly susceptible to attack from it. It can kill the affected area if left unchecked and at the very least it will cause an uneven putting surface. The fine fescue grasses we are using this week are not susceptible to this disease, so the more of this grass species we can encourage the healthier our greens will be.
Top-dressing helps smooth the surface following the core aeration work. The sand/soil mix was applied very lightly to the surface of the green on two occasions this week. One application was made before the seed was sown and one after. Hopefully, down each tine hole we have a few fescue seeds sandwiched between two layers of top dressing. All we now need is the constant presence of a little moisture and some heat and we will have success. Top dressing has a number of other benefits to the turf on which I may make a separate posting later on.
Top-dressing putting green
I hope golf has not been too disrupted while this work has been taking place but I'm sure everyone would agree that the potential benefits make the temporary inconvenience worthwhile.