Turf Stripping 12th Green

After months of planning we have finally begun the greens reconstruction project on holes 10, 11 & 12. Today we stripped the sod from the 12th green.

Before we starting we gave the surface one final mow. The sod was then cut before the course team began lifting the individual turf strips. The 12th green is 660m2 so we really had our work cut out!

The turf was loaded onto trailers and transported to areas in the valley where it was laid out onto plastic sheeting.