With all the turf now lifted from the 12th the course team have moved onto the 11th green complex to begin lifting the turf. The short video below shows Andrew cutting the sod.
Once lifted, the turf is taken to the flat area next to the reservoir where it is laid onto plastic sheeting. The sheeting is used to ensure the turf does not root into the ground beneath before we are ready to lift and relay it.
No comments:
Post a Comment