We have almost completed the scheduled works for the maintenance week. Scarification, micro hollow tining, brushing and seeding operations have been undertaken on greens. Top dressing work will hopefully be completed before the weekend.
With the holes made in the greens we took the opportunity to apply our first application of wetting agent. This is a product that helps the soil hold onto moisture making our irrigation applications more efficient. We apply wetting agent once each month throughout the playing season.
Thursday, 22 March 2012
Friday, 16 March 2012
New Holes - Update
I am pleased to report that the turf on the new holes has settled in well. Mowing operations have been carried out on the greens at a height of 7mm. This will be gradually lowered in the coming days and weeks until it reaches the same height of cut as the rest of the greens on the course. The imported turf on the surrounds and approaches has, as expected, taken longer to become accustomed to its new surroundings. Although the root development of the new turf is generally good, there are one or two very localised areas that need to improve. Mowing operations on the imported turf are somewhat behind those on the greens turf but the next 2 weeks will see an increase in surface preparations works on these areas in readiness for play by May 1st.
The new bunkers will be filled with sand from early next week.
There are still a two particularly weak areas; the left side of the 10th hole beyond the fairway bunkers was heavily trafficked during the construction phase. The soil in this area has a very high proportion of clay and became very compacted under the heavy machinery. Deep verti-draining has been carried out on two occassions to relieve the compaction and seeding work has been done to begin to improve grass cover. The carry on the 13th hole was used to mix rootzone for the 11th and 12th greens and significant turf degradation has taken place here also. Again, aeration and seeding work has been undertaken to reinstate a playable surface but more time is required before we see proper recovery.
Planting of Marram grass sprigs has been on-going since early February. Individual plants are taken from the dunes near the reservoir and are being re-planted on the left side of the 11th hole. It is hoped that some rain will fall to help in the establishment of these sensitive areas.
There are still a two particularly weak areas; the left side of the 10th hole beyond the fairway bunkers was heavily trafficked during the construction phase. The soil in this area has a very high proportion of clay and became very compacted under the heavy machinery. Deep verti-draining has been carried out on two occassions to relieve the compaction and seeding work has been done to begin to improve grass cover. The carry on the 13th hole was used to mix rootzone for the 11th and 12th greens and significant turf degradation has taken place here also. Again, aeration and seeding work has been undertaken to reinstate a playable surface but more time is required before we see proper recovery.
Planting of Marram grass sprigs has been on-going since early February. Individual plants are taken from the dunes near the reservoir and are being re-planted on the left side of the 11th hole. It is hoped that some rain will fall to help in the establishment of these sensitive areas.
We aim to ensure that all new bunkers have easy access and egress for players of all ages.Sand will be shaped to encourage the ball to come to rest in the centre of the bunker; there will of course be occasions when this does not happen but surely that is a fundamental part of the game and part of the appeal of the sport? Much work has been done on the paths next to the tees on holes 11, 12 and 13. A new route is being created for buggies to follow that ensures wear is kept to a minimum. When the holes re-open it is imperative that players adhere to the directional signs that will be positioned on the new holes.
Friday, 9 March 2012
Growing In New Turf
Much work is being carried out on the new greens to ensure the surfaces are ready for play when the time comes. We have recently completed solid tine aeration on the turf. This was carried out to encourage the roots of the plants to move deeper into the soil beneath.
A light scarification of the turf was followed by top dressing with the aim of improving surface firmness. The greens turf has become excessively soft over the winter. This is mostly due to the fact that there has been no play and very few mechanical operations undertaken. The emphasis over the nest few weeks will be on improving firmness with repeated applications of dressing.
Thursday, 8 March 2012
13th Tee Path Construction
Work is progressing well on the refurbishment and extension of the 13th tee path. New wooden edging is being put in to improve the look of the path and to properly define the edges.
Thursday, 16 February 2012
New 2nd Ladies Tee
Follow a request from the Ladies Section, we have started work on a new ladies tee at the 2nd hole. The new tee will offer an improved line into the fairway and will be situated to the left side of the path, in the area adjacent to the existing tee. Measurements have been taken to ensure the overall length of the hole remains the same.
The next task was to install the irrigation pipework and heads.
After the area was marked out, an excavator was used to scrape off the top layer. The soil beneath was then rotovated to improve tilth.
The next task was to install the irrigation pipework and heads.
Wednesday, 8 February 2012
12th Tee Realignment
The 12th tee has been modified slightly to ensure that it points squarely toward the new green. The sleeper edging has been removed and has been replaced with a length of half round rail and a slightly sloping bank. This has allowed us to alter the line of the edge of the tee.
Tuesday, 17 January 2012
Hole 10 Complete
Following the festive break and despite some adverse weather conditions, we have finally completed the turfing works on hole 10.
We are currently almost finished turfing the banking around the new 11th tees. Next up will be the realignment of the paths at the 12th and 13th tees.
We are currently almost finished turfing the banking around the new 11th tees. Next up will be the realignment of the paths at the 12th and 13th tees.
Monday, 12 December 2011
Hole 10 Update
Last week we finally got the turf laid on the 10th green. The sod had been cut lifted from the old 11th green on the 5th October and had been sitting on plastic sheeting for the past 8 weeks. It was a huge relief to get it laid at long last. Hopefully it will enjoy its new surroundings more than its temporary home in the valley next to the reservoir!

All bunker revetting is now complete also. The earthworks contractor has top-soiled the entire area and the whole area is being given its final prep today before turfing of the surround and approach begins tomorrow.
All bunker revetting is now complete also. The earthworks contractor has top-soiled the entire area and the whole area is being given its final prep today before turfing of the surround and approach begins tomorrow.
Hole 11 Tee Construction
The new 11th tees have been constructed and are now ready for turfing this week. The surfaces have been extended at the back by around 5 metres and at the front by around 3 metres. We now have around 370m2 of teeing area split between the white and yellow surfaces. Both surfaces have been realigned and now point squarely towards the target area on the fairway. The trees on the left of the image below will be trimmed back in the coming weeks to give an improved view of the left edge of the fairway.
Friday, 2 December 2011
Turfing Hole 11 Approach
This week we took delivery of 1600m2 of turf from our supplier in the UK. The material has been laid on the surround and approach are on the 11th hole.
The first of two loads arrive